RZA3UL TES Guiliani Getting Started Guide
Getting Started
This section describes how to Compile and download the Tes Guilaini Demos on to the RZA3UL.
NOTE: If the IPL has not been loaded refer to the Loading the IPL.
- Extract the Tes Guiliani archive file (Guiliani_SDK_<version>_Renesas_RZA3UL_FreeRTOS10_eGML.zip) to a working directory. ( i.e. C:\workspace ) The resulting directory will look like this.
└── Guiliani_SDK_2.5.0_Renesas_RZA3UL_FreeRTOS10_eGML ├── CMake ├── Documentation ├── Export ├── External ├── FlashTools ├── GSE ├── Guiliani ├── Renesas ├── SR_GuilianiDemo ├── StreamRuntime └── eGaC
- Start eclipse IDE
- In the IDE workspace dialog select the Renesas subdirectory in the extracted folder
- Example : C:\workspace\Guiliani_SDK_2.5.0_Renesas_RZA3UL_FreeRTOS10_eGML\Renesas
- In the IDE workspace dialog select the Renesas subdirectory in the extracted folder
Select Workspace | ||
- The Project Explorer in the IDE should be empty
- Import the TES Projects into the IDE
- Right click in the Project Explorer and Select Import
- In the Import Dialog select General -> Existing Projects and Workspaces
- In the Import Projects Dialog press the Browes Button then press the Select Folder Button in the popup dialog. Select only the following projects then click Finish.
- BSP
- SR_GuilianiDemo
- Select the SR_GuilianiDemo Project. Right Click and select build. This build will do the following
- The Build will attempt a clean first. This will cause an error as there is nothing to clean
- Next the Build will first build the BSP Library
- Finally the SR_GuilianiDemo will build with no errors
- The Generated executable and library files
- SR_GuilianiDemo ELF file
- Debug information
- SR_GuilianiDemo.sec
- Binary Code
- rza3ul_smarc_qspi_ipl.srec
- IPL boot loader
- Resources.srec
- This is the GUI Widget Resouce file. This is generate the GSE.
- SR_GuilianiDemo ELF file
- Download ( J-Link)
- This section refers the Debug Configuration “Renesas GDB Hardware Debug”.
- Connect power to the USBC connector
- Connect the J-Link to the Smarc Module. Use the dongle that is provided.
- Press and hold the red power button till the power leds are on.
- In the menu select Run -> Debug Configurations
- In the Debug Configuration Dialog select Renesas GDB Hardware Debug then SR_GuilianiDemo Debug.
- NOTE: If Main Tab has a red dot this indicates the Project with the Debug Configuration was not compiled. Return to step 5.
- A Segger Dialog window will show the progress of the download.
- This section refers the Debug Configuration “Renesas GDB Hardware Debug”.
Install the IPL
TBD
Display Configuration
TBD